Our Most Relevant Projects
We deliver comprehensive solutions for process and comfort applications.
VOLVO
Nuevo León 2025-2026 Chiller plant system – 1,500 tons of cooling capacity PPR chilled water distribution piping system
FORD El Cristo
State of Mexico, México. 2021-2023. CPB – EGL BUILDING Chiller system – 1,500 tons cooling capacity Chilled water air handling units – 272,900 CFM PPR chilled water distribution piping system.
General Motors Ramos Arizpe
Installation of 10 TMI units — 2,400 tons cooling capacity Supply and installation of 60 exhaust fans — 1,260,000 CFM Direct expansion system — 262 tons cooling capacity Dedicated ventilation systems for JCI equipment. PLANTA GPS – BODYSHOP GPS Plant — Body Shop Installation of 56 TMI units — 2,970,000 CFM Supply and installation of 132 exhaust fans — 3,330,000 CFM Direct expansion system — 795 tons cooling capacity
Goodyear
MANUFACTURING PLANT Ventilation and air renewal system — 2,916,560 CFM
Ford Hermosillo
Suministro e instalación de 3 chillers centrífugos de 1000 toneladas cada uno, 3 torres de enfriamiento de 3,000 GPM cada una, Chilled water and condenser water pumping systems Control systems Ten 60-ton chilled water air handling units Heavy lifting and assembly of four 500-ton TMI air handling units
Foxconn
Technology manufacturing plant Chilled water and liquid cooling system for critical processes 25,000 TR chilled water process system Over 15,000 linear meters of steel piping
Amazon Data Center
Chiller water plant with variable flow pumping system Dedicated air handling units (DAHU) — total capacity 850,000 CFM Greenheck energy recovery systems in Data Hall 170 m³ Thermal Energy Storage system High-efficiency Mitsubishi VRF system and Daikin energy recovery ventilation system in main office building
Citi Banamex
Supply and installation of 1,050 tons air-cooled chiller system Cooling towers — 3,150 GPM Secondary pumping system — 2,520 GPM
Grand Kino
Water Source Heat Pump system Cooling towers — total 1,080 GPM Heat exchanger system VFD pumping system — 1,120 GPM Integrated BMS and fire protection system
Colossus
Water Source Heat Pump system Cooling towers — total 1,080 GPM Heat exchanger system VFD pumping system — 1,120 GPM Integrated BMS and fire protection system
Celtara Medical and Professional Center
Water Source Heat Pump system Cooling towers — 1,026 GPM Heat exchanger system Variable flow pumping system Integrated BMS and fire protection system
Hospital Ángeles Puebla
HOSPITALIZACIÓN MEDICAL TOWER – HOSPITALIZATION Direct expansion system — 600 tons Chiller system — 700 tons Fresh air renewal system
Hospital Ángeles Tijuana
MEDICAL TOWER – HOSPITALIZATION Direct expansion system — 270 tons Chiller system — 700 tons Fresh air renewal system
Kimberly Clark (Área Sequoia)
Supply and installation of 830 tons in split systems, rooftop units, and direct expansion ventilation units for clean room applications
Pepsico
Replacement of six 300-ton INTELLIPACK units Replacement of galvanized sheet metal duct systems with textile duct solutions
Cervecería Modelo Hidalgo
Supply and installation of 160 tons VRF system 50 tons direct expansion system Supply and installation of 132 HP refrigeration systems for cold storage rooms
Cervecería Modelo Cd. Obregón
Corporate Headquarters Office HVAC upgrade using 140-ton Mitsubishi VRF system 26-ton Daikin energy recovery ventilation system
Latecoere
Construction and conditioning of ISO 9 controlled environment room comprised by three 20-ton packaged units with inline boosters to achieve positive pressure
Omni pontoque
VRF System Installation
Playa Blanca Luxury Condos
670 tons direct expansion HVAC system
Hotel y villas VIDAFEL
Edificio 3, expansión Directa, 480 toneladas.
Hotel Lucerna
400-ton chiller system